Not sure Tim, I've emailed him for an update but not heard anything back.  His original estimate was about 10 weeks to turn it around.  I'm not in any huge hurry though because if I can get the A and B pillars made, and the doors hung then Jim is going to build in a small roll cage / seat belt mounting type affair at the same time.  I can't get him to do that though until I know where the seats will actually be.
#5753
Ben Stevens
Keymaster

Not sure Tim, I’ve emailed him for an update but not heard anything back.  His original estimate was about 10 weeks to turn it around.  I’m not in any huge hurry though because if I can get the A and B pillars made, and the doors hung then Jim is going to build in a small roll cage / seat belt mounting type affair at the same time.  I can’t get him to do that though until I know where the seats will actually be.